Posted by Dave H
on October 4, 2010 at 11:39 AM
|
|
We have 3 baseboards built and sealed, materials ready at the club for the next 2.
Legs need to be added to these boards, some material is present, bolts are needed.
The count of lengths of half track is very good with Mike G and Rob F working on more.
There is plenty of rail and more copperclad has been ordered.
Oops!
Oops, you forgot something.